
Settlement along the front elevation
Exterior steel piers set to load-bearing depth
The front of the house had dropped enough to open stair-step cracks in the brick and pull the entry door out of square. Measurements confirmed the movement was concentrated along one elevation.
We dug access at each placement, drove steel to load-bearing depth, and lifted back to a practical elevation. Interior finishes were not disturbed.













